 |
Home >
Research Support Group >
AccessGrid >
Monthly Status Report
January, 2011:
December, 2010:
November, 2010:
-
Hardware, Software and/or Operational Details for Room GSB 315:
- November 2: Coast to Coast Seminar:
A Sea of Change
by Dr. Marlon Lewis, Department of Oceanography, Dalhousie University
- November 3: WestGrid Seminar:
Molecular Simulations of Biomolecules
by Gurpreet Singh, PDF, University of Calgary
- November 16: Coast to Coast Seminar:
How will marine ecosystems adapt to a future ocean that will be warmer, more stratified, more acidic and less oxygenated?
by Dr. Ken Denman, Institute of Ocean Sciences, Department of Fisheries and Oceans
- November 17: WestGrid Seminar:
Multi-sensory Exploration of Large Scientific Data Using Virtual Reality
Pierre Boulanger, Professor, Department of Computing Science, University of Alberta
- November 30: Coast to Coast Seminar:
Climate Impacts of Freshwater Forcing of the Ocean General Circulation
by Dr. Richard Peltier, Centre For Global Change Science, University of Toronto
- Final configuration for h.264 webstreaming via VLC
- Upgrade of all computers in node to AG 3.2 non-beta
- Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2010.monthly.html
October, 2010:
-
Hardware, Software and/or Operational Details for Room GSB 315:
- October 5: Coast to Coast Seminar:
Insight into Lower Atmospheric Composition from Remote Sensing and Modeling
by Dr. Randall Martin, Department of Physics and Atmospheric Science, Dalhousie University
- October 6: WestGrid Seminar:
Getting Started: An Introduction to WestGrid
by Doug Phillips, Scientific Computing Consultant, IT, University of Calgary
- October 19: Coast to Coast Seminar:
Anthropogenic Influence on Long Return Period Daily Temperature Extremes at Regional Scales
by Dr. Francis Zwiers, Pacific Climate Impacts Consortium, University of Victoria
- October 20: WestGrid Seminar:
Watching Biomolecules Move: Computer Simulations of Lipids and Membrane Proteins
by Peter Tieleman, Professor, Department of Biological Sciences, University of Calgary
- Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2010.monthly.html
September, 2010:
August, 2010:
July, 2010:
June, 2010:
May, 2010:
April, 2010:
March, 2010:
-
Hardware, Software and/or Operational Details for Room GSB 315:
- Installed an nVidia update which made one of the graphics cards in the display machine
behave the way we want. We are getting a PCI graphics card so that we don't have
display devices with different resolutions on the same graphics card.
- The projector mounts (the pipes in the ceiling) were shifted slightly so the new projectors
are square to the display.
-
March 2: Coast to Coast Seminar
-
March 16: Coast to Coast Seminar
-
March 30: Coast to Coast Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2010.monthly.html
February, 2010:
-
Hardware, Software and/or Operational Details for Room GSB 315:
- February 22: New projectors installed - 4x Canon
REALiS SX80 Mark II
The native resolution is 1400x1050. Windows doesn't detect the
projectors properly through the existing VGA cables but works fine
with DVI cables. We are seeing about having the cables and video
splitters changed to DVI.
-
February 2: Coast to Coast Seminar
-
February 16: Coast to Coast Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2010.monthly.html
January, 2010:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Use of our new AG computers continues without issues
- The Sony HD camera is now working well with the Lifesize H.323 system.
-
January 19: Coast to Coast Seminar
-
January 20: WestGrid Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2010.monthly.html
December, 2009:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Use of our new AG computers continues without issues
- The H.323 continues to be tweaked. The LifeSize Room 200 camera
works perfectly, while the Sony HD camera seems to have a problem
with image quality - we have ordered a new cable, which may
fix this.
-
December 1: Coast to Coast Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2009.monthly.html
November, 2009:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
The old AG machines have been replaced with new systems, 2 running
64-bit Windows 7 Enterprise, and 2 running 64-bit Kubuntu Linux.
These have been used in meetings without any problems.
- Cart for the H.323 system has arrived. This has been assembled and the bulk
of the equipment has been installed. We need some cables and small items to
complete the installation - these items have been ordered.
-
November 3: Coast to Coast Seminar
-
November 4: WestGrid Seminars
-
November 17: Coast to Coast Seminar
-
November 18: WestGrid Seminars
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2009.monthly.html
October, 2009:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
New collaboration hardware has mostly arrived. Assembly and testing
is ongoing.
-
October 6: Coast to Coast Seminar
-
October 7: WestGrid Seminars
-
October 20: Coast to Coast Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2009.monthly.html
September, 2009:
August, 2009:
July, 2009:
June, 2009:
May, 2009:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Power supply in audio machine replaced - the machine is working
fine now.
-
The audio machine failed again. All the machines are off warranty -
time to start shopping for new hardware.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2009.monthly.html
April, 2009:
March, 2009:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Mar. 3: Coast to Coast Seminar
-
Mar. 10: U of A High Performance Computing Seminars
-
Mar. 17: U of A High Performance Computing Seminars
-
Mar. 17: Coast to Coast Seminar
-
Mar. 31: Coast to Coast Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2009.monthly.html
February, 2009:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Feb. 3: U of A High Performance Computing Seminars
-
Feb. 3: Coast to Coast Seminar
-
Feb. 17: U of A High Performance Computing Seminars
-
Feb. 17: Coast to Coast Seminar
-
Feb. 24: U of A High Performance Computing Seminars
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2009.monthly.html
January, 2009:
December, 2008:
November, 2008:
October, 2008:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
-
Oct. 8: WestGrid Training Seminar
-
Oct. 14: Coast to Coast Seminar
-
Oct. 22: WestGrid Training Seminar
-
Oct. 28: Coast to Coast Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2008.monthly.html
September, 2008:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Air conditioning in the room is not turning off any more. I called
building services but nothing has been done yet.
-
Sept. 16: Coast to Coast Seminar
-
Sept. 17: WestGrid Training Seminar
-
Sept. 30: Coast to Coast Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2008.monthly.html
August, 2008:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Testing H264 video. There are some rainbows around reflections from the chairs
in the room. I suspect that these are encoding artifacts. The video size isn't
640x480 and apparently this is due to using an older vic, but I don't see where
to get a newer one - the machines are as up to date as I can make them without
building the packages myself.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2008.monthly.html
July, 2008:
June, 2008:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
June 20:
-
Installed Kubuntu 8.04 on the audio and video capture machines
-
Windows machines updated to Windows XP Service Pack 3
-
All machines updated to AG 3.1 software - it seems to be working
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2008.monthly.html
May, 2008:
April, 2008:
March, 2008:
February, 2008:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Feb. 5: Coast to Coast Seminar
-
Noncommutative Surfaces
by Dr. Colin Ingalls, Department of of Mathematics and Statistics,
University of New Brunswick
-
Feb. 19: Coast to Coast Seminar
-
Feb. 6: WestGrid Training Seminar
-
Feb. 20: WestGrid Training Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2008.monthly.html
January, 2008:
December, 2007:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
University of Alberta Access Grid node has been given Quality Assurance Status.
-
Dec. 4: Coast to Coast Seminar
-
Dec. 5: WestGrid Training Seminar
-
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2007.monthly.html
November, 2007:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Nov. 6: Coast to Coast Seminar
-
Nov. 7: WestGrid Training Seminar
-
Nov. 20: Coast to Coast Seminar
-
Nov. 21: WestGrid Training Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2007.monthly.html
October, 2007:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Oct. 9: Coast to Coast Seminar
-
Oct. 10: WestGrid Training Seminar
-
Oct. 23: Coast to Coast Seminar
-
Oct. 31: WestGrid Training Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2007.monthly.html
September, 2007:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Sep. 5: Installed the new University of Alberta venueserver in the
computing center:
-
https://venues.srv.ualberta.ca:8000/Venues/default.
-
Video connector fixed for camera 2, the center one at the front of GSB 315.
-
Sep. 14: Venueserver and bridge moved to a different switch because they
lose network connectivity intermittently. The machines behave well on
the new switch.
-
Sep. 25: Coast to Coast Seminar
-
Sep. 26: WestGrid Training Seminar
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2007.monthly.html
August, 2007:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Aug. 25 - 27: Access Grid console moved from the Southeast to the Northwest
corner of GSB 315 in order to reduce congestion at that end of the room.
-
Aug. 28 - 31: Console tests to verify its function.
-
Aug. 31: Installed a multicast bridge in the computing center: bridge.srv.ualberta.ca.
This a Pentium 4 machine (3.8 GHz) with 2 GB of RAM.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2007.monthly.html
July, 2007:
June, 2007:
May, 2007:
April, 2007:
March, 2007:
February, 2007:
January, 2007:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Installed Extron
MDA 3V
distribution amplifiers to enable web streaming of the WestGrid seminars.
-
Installed a Clear One
(Gentner) Phoenix connector wired to a 1/8" stereo jack
to enable web streaming of the audio for the WestGrid seminars. This connects an output from our
XAP 800
directly to the line-in of a computer doing the streaming.
Here is a photograph of the wiring -
red and white leads on the left, bare copper leads on the right.
Here is the
AG page
on how to do this.
- Note that for the web streaming now, we do both audio and video capture on a machine running Linux,
and the web streams are sent out by another machine running Linux.
-
Coast to Coast Seminar series hosted by Simon Fraser University
IRMACS Center
and Dalhousie University
DDrive
-
WestGrid Training Seminars:
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2007.monthly.html
December, 2006:
November, 2006:
October, 2006:
September, 2006:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
OS and software updates.
-
Geowall software installed on the display machine. Passive stereo is
working very well - we are using linear polarizing filters and there
is only a bit of ghosting.
-
Coast to Coast Seminar series hosted by Simon Fraser University
IRMACS Center
and Dalhousie University
DDrive
-
Tuesday, September 26, 2006 seminar:
Sampling in Networks
by Dr. Steve Thompson from Simon Fraser University
-
WestGrid Training Seminar:
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2006.monthly.html
August, 2006:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
The new control machine was returned with a new motherboard. I updated the
bios and the machine became unusable again. The machine was returned to the
supplier who obtained a new bios chip and brought the machine back with the
latest bios installed. I tried to install WinXP on the machine: no matter what I
did the install wouldn't complete - the machine went back to the supplier.
The machine was returned and the OS installation now succeeds - the problem was
that the 2 memory sticks needed to be installed together on the primary cpu
rather than separated between the cpus.
-
Moved venueserver2.westgrid.ca into the center and out of my office. Sharad
multicast enabled on the new network, and Todd and I had a successful test meeting.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2006.monthly.html
July, 2006:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Waiting for the return of our new control machine with its new motherboard.
-
Using AG 3 and it seems to work well - haven't run into any big problems.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2006.monthly.html
June, 2006:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
3 of the new machines for our node were configured and installed, display, video and audio capture.
One machine seems to have a corrupted bios and has been taken away for a motherboard replacement.
-
A note on our new machines (see May for a description of the display machine):
-
the new capture machines have Tyan
Tiger K8WE
motherboards
-
1 GB of ram
-
2 x Opteron 246 (2.0 GHz) processors
- 1 x nVidia
Quadro FX 1300
PCIe graphics card
-
We have 2 video capture cards, a FALCONquatto from
IDS Imaging
and an
iTuner
Spectra8.
Both of these cards show a hardware conflict when installed in the Intel
SE7505VB2
motherboards that we used previously.
The conflict results in only 3 video streams being available. Moving the
boards to a different PCI slot changes which streams are available, but we
still get only 3 video streams (this is true under both Windows and Linux).
A way around this conflict was never found.
When these capture boards are installed in the Tyan Tiger K8WE motherboards
there are no hardware conflicts and we get 4 video streams from either card.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2006.monthly.html
May, 2006:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Regular updates for OSes and software
-
4 new machines were delivered for our node - one was loaned to our
cluster administrator to allow him to develop an installation cd
for the new cluster.
-
Installed OSs and software on the new machines in preparation for
installing them in GSB 315
-
The new display machine stats (it's really snappy):
-
Tyan
Thunder K8WE
motherboard
-
2 GB of ram
-
2 x Opteron 246 (2.0 GHz) processors
- 2 x nVidia GeForce
7800 GTX
PCIe graphics cards
-
One note of weirdness with the Tyan Thunder K8WE motherboard: I disabled the
onboard audio and installed a SoundBlaster Live card (32 bit PCI slot), which has always worked
well with RAT. This disabled both onboard network ports. I then tried an Audigy card
(64 bit PCI slot). This also disabled the network ports. I tried the Audigy card in 2 of the
available PCI slots without any luck. The network is disabled even without installing
any drivers for the sound card. I have the latest drivers for everything installed and
a call to Tyan support got no more information. The display machine doesn't need a sound
card when operating as a room node, but there are times when I want to use it as a PIG
so I'd like to see this resolved.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2006.monthly.html
April, 2006:
March, 2006:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Our center camera was lowered by 20 inches. The view of participants is
now much more natural.
-
Reconfiguration of the audio to allow more flexibility with better
sound quality. One audio cable generates a buzzing sound for the remote
sites - this is unresolved.
-
Regular updates for OSes and software
-
Obtained a new machine for the WestGrid backup venueserver: venueserver2.westgrid.ca.
The machine is now a Pentium 4, 3.2 GHz with 2 GB of ram. Installed
Fedora Core 5 on the machine so it could be configured with the beta
version of AGtk3.
-
Taking part in the Coast to Coast Seminar series hosted by Simon Fraser
University and DDrive
at Dalhousie University
-
WestGrid Training Seminar:
-
March 8, 2006 seminar: Introduction
to SciViz by Jon
Johansson from the University of Alberta
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2006.monthly.html
February, 2006:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Installed 2 rack-mount shelfs in the AG cart to try to organize some of
the cable mess on the floor of the cart - a big improvement.
-
Regular updates for OSes and software
-
Taking part in the Coast to Coast Seminar series hosted by Simon Fraser
University and DDrive
at Dalhousie University
-
WestGrid Training Seminar:
-
February 2, 2006 seminar: Parallel
Programming with OpenMP
by Edmund Sumbar from the University of Alberta
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2006.monthly.html
January, 2006:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Regular updates for OSes and software
-
Taking part in the Coast to Coast Seminar series hosted by Simon Fraser
University and DDrive
at Dalhousie University
-
January 17, 2006 seminar: Solving
Checkers by
Jonathan Schaeffer from the University of Alberta
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2006.monthly.html
December, 2005:
November, 2005:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Regular updates for OSes and software
-
Attended the SC Global and Desktop version of SuperComputing
2005
-
Notes: I really enjoyed the ability to attend the technical talks via
Access Grid. We attended as a room node (paid a room node sized fee). A
couple of technical glitches led to some frustration:
-
1) I chose to attend more general talks as they tend to be fun and
accessible to a wide audience. These talks seemed to be in the one room
that was unequipped to properly deliver the speaker's PowerPoints via
IGPix. The workaround was to turn a video camera on the PPT and send
the slides in a vic stream - the resulting quality was really not
acceptable, unfortunately. It could have been better if the bitrate of
the video stream had simply been turned up. The vic stream for PPT did
have the advantage of showing animations well, which is something
lacking in IGPix. A proper IGPix delivery of PPT, coupled with a video
stream to deliver animations would have worked well.
-
2) Some talks in AG Desktop were made unavailable at the last minute
because the speakers refused to be broadcast over AG, even though they
had apparently previously signed the release forms for video/audio.
This was something the organizers couldn't control, but it was very
disappointing, nonetheless.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2005.monthly.html
October, 2005:
September, 2005:
August, 2005:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
Updates for operating systems, Windows XP and Linux
-
Updates for firewall and antivirus software
-
Ceiling mount for polarizing filters installed (passive stereo)
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2005.monthly.html
July, 2005:
June, 2005:
-
Hardware, Software and/or Operational Details for Room GSB 315:
-
No scheduled (or unscheduled) maintenance took place in June.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2005.monthly.html
-
Documentation/Web:
-
Reformatting and updating of the local web pages; changed CNS to AICT.
May, 2005:
-
Hardware, Software and/or Operational Details:
-
Room GSB 315:
-
InFocus LP530 projectors removed and NEC LT245 projectors installed.
-
AG hardware configured and Geowall software installed to provide
passive stereo projection capability.
-
Added streaming Digital Video capability and tested by sending to
Calgary.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2005.monthly.html
-
Documentation/Web:
-
Reformatting and updating of the local web pages; intermittent but
ongoing.
April, 2005:
-
Hardware, Software and/or Operational Details:
-
Room GSB 315:
-
Warranty work on the projectors for room 315; ongoing.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2005.monthly.html
-
Documentation/Web:
-
Reformatting and updating of the local web pages; intermittent but
ongoing.
March, 2005:
-
Hardware, Software and/or Operational Details:
-
Room GSB 315:
-
Warranty work on the projectors for room 315; ongoing.
-
Access Grid Room Usage Report available:
http://www.ualberta.ca/AICT/RESEARCH/AG/Usage/2005.monthly.html
-
Documentation/Web:
-
Reformatting and updating of the local web pages; intermittent but
ongoing.
February, 2005:
-
Hardware, Software and/or Operational Details:
-
Room GSB 315:
-
Warranty work on the projectors for room 315; ongoing.
-
Venue server:
-
down on Feb 10th; eventually restart/reboot machine.
-
Plans for moving machine to SFU; ongoing.
-
Access Grid Room Node Events for February:
-
Documentation/Web:
-
Reformatting and updating of the local web pages; intermittent but
ongoing.
January, 2005:
-
Hardware, Software and/or Operational Details:
-
Room GSB 315:
-
Warranty work on the projectors for room 315; ongoing.
-
Access Grid Room Node Events for January:
-
Documentation/Web:
-
Reformatting and updating of the local web pages; intermittent but
ongoing.
December, 2004:
-
Hardware, Software and/or Operational Details:
-
Room GSB 315:
-
Warranty work on the projectors for room 315; ongoing.
-
Node machines configured for dual boot.
-
Access Grid Room Node Events for December:
-
Documentation/Web:
-
Reformatting and updating of the local web pages; intermittent but
ongoing.
November, 2004:
-
Hardware, Software and/or Operational Details:
-
Power interruption, due to construction in near by rooms, caused
venueserver.westgrid.ca (and other machines not connected to a UPS) to
go down intermittently through out the month.
-
Room GSB 315:
-
Warranty work on the projectors for room 315; ongoing.
-
New nodes on Campus:
-
TRLabs: The computer system, and various audio and video equipment, was
moved to TRLabs.
-
Access Grid Room Node Events:
-
Documentation/Web:
-
Reformatting and updating of the local web pages; intermittent but
ongoing.
October, 2004:
-
Hardware, Software and/or Operational Details:
-
Room GSB 315:
-
Replaced fans and heatsinks on all 4 computers to reduce the noise
level.
-
Warranty work on the projectors for room 315; ongoing.
-
New nodes on Campus:
-
AMMI Lab: Swapped sound card.
-
TRLabs: The new computer system is functional and remains in temporary
room location (i.e., 323C GSB) until the space in TRLabs is equipped
with projectors, cameras, etc.
-
Access Grid Room Node Events:
-
Documentation/Web:
September, 2004:
-
Hardware, Software and/or Operational Details:
-
Room 315; Sep 13 - Sep 30:
Scheduled maintenance and upgrade on machines and software:
-
Installed additional disks in all four computers.
-
Upgraded AG software.
-
Access Grid Room Node Events for September:
-
Documentation/Web:
-
Reformatting and updating of the local Access Grid web pages;
intermittent but ongoing.
August, 2004:
-
Hardware, Software and/or Operational Details:
-
Warranty work on the projectors for room 315; ongoing.
-
New nodes on Campus:
-
Aug 03: New AG equipment for the AMMI Lab arrived, and initial local
setup and testing was completed. On Aug 25 we moved equipment to AMMI
Lab (i.e., Room 363 Computing Science Building).
-
New AG equipment for TRLabs arrived. Setup in temporary room location
(i.e., 323C GSB) until space is available in TRLabs.
-
Access Grid Room Node Events for August:
-
Documentation/Web:
July, 2004:
-
Hardware, Software and/or Operational Details:
-
Backup venue server, venues.AICT.ualberta.ca; upgraded to Fedora Core 2
/ AG2.2 .
-
Annual Grid Certificate expired; requested new one.
-
Warranty work on projectors; ongoing.
-
Access Grid Room Node Events:
-
July 05: Test/demo 1 of the solution server; with AG connection with
SFU.
-
July 08: Joined the regularly scheduled WG Access Grid technical
meeting.
-
July 12: Test/demo 2 of the solution server; with AG connection with
SFU.
-
July 15:
-
Re-test/demo of solution server.
-
Test of connection to Daresbury UK for upcoming AuP meeting.
-
Joined the regularly scheduled WG Access Grid technical meeting.
-
July 19: Test/demo 3 of the solution server; with AG connection with
SFU.
-
July 20: Daresbury UK - UofA; AuP meeting.
-
July 22: Joined the regularly scheduled WG Access Grid technical
meeting.
-
July 29: Joined the regularly scheduled WG Access Grid technical
meeting via a personal node; certificate problems with room node; new
certificate requested.
-
Documentation/Web:
June, 2004:
-
Room Renovation Status; completed.
-
Final details:
-
Enhanced screen frame construction; completed.
-
One additional light fixture ordered, received and installed.
-
Installation of security system for the door; completed.
-
Hardware/Software and Operational:
-
June 04: Backup venue server down for the day; moved to new location.
-
Warranty work on projectors; ongoing.
-
Access Grid Events:
-
June 03: Joined the regularly scheduled WG Access Grid technical
meeting.
-
June 07: Access Grid Test 1: Daresbury UK - SFU - UofA - Dal Halifax.
-
June 09: Access Grid Test 2: Daresbury UK - SFU - UofA - Dal Halifax.
-
June 14: Access Grid Test 3: Daresbury UK - SFU - UofA - Dal Halifax.
-
June 15: Support for Access Grid meeting: PI's in Daresbury UK and
UofA; (note that SFU colab joined the session - remote technology
monitoring)
-
June 17: Joined the regularly scheduled WG Access Grid technical
meeting.
-
June 18: SFU - UofA meeting; future test/demo's of the solution server.
-
June 24: For AICT staff "renovations completed" session; note
that various members of the WG AG technical group joined in.
-
June 25: Joined a re-scheduled WG Access Grid technical meeting.
-
Documentation/Web:
May, 2004:
-
Room Renovation Status:
-
Ceiling work completed.
-
Lighting installation completed. However, one addition light fixture
has been requested.
-
Screen frame construction completed. However, an enhanced design of the
frame is being implemented.
-
Camera installation completed.
-
Projectors are installed and semi-operational. However, two projectors
need warranty work; this will be scheduled as soon as possible.
-
Installation of security system for the door has started.
-
Site Specific Hardware/Software Installation Status:
-
The installation of the multi-node equipment into the cart is
completed.
-
May 25-26: Backup venue server was relocated; and consequently
unavailable for those days.
-
AccessGrid Events:
-
May 03: AG meeting with NRC Ottawa (Attendees were; Charles Bradbrooke,
Ken Emig, Andrew Patrick and Siraj Sabihuddin). The purpose was to
allow Charles to discuss with Ottawa AG users the design and usability
of their AG node.
-
May 06: Joined the regularly scheduled WG AccessGrid technical meeting.
Archive copy of Todd's summary notes are available locally at:
http://www.ualberta.ca/AICT/RESEARCH/AG/
MeetingNotes/WestgridAG-04May06.pdf
-
May 13: Unable to join the regularly scheduled WG AccessGrid technical
meeting;
summary notes are not currently available.
-
May 20: Regularly scheduled WG AccessGrid technical meeting was
canceled.
-
May 25: Access Grid Introduction and Demo in the newly renovated room
315.
A one hour demo was held as part of "Parallel Computing and
Visualization" workshop.
The demo highlighting the capabilities of the Access Grid facilities.
Approximately 25-30 people attended.
-
May 27: Joined the regularly scheduled WG AccessGrid technical meeting.
Archive copy of Todd's summary notes are available locally at:
http://www.ualberta.ca/AICT/RESEARCH/AG/
MeetingNotes/WestgridAG-04May27.pdf
-
Documentation/Web:
-
Made a few minor updates to our local AccessGrid web site.
April, 2004:
-
Room Renovation Status:
-
Lighting and ceiling work are predominant during the beginning of
April.
-
Room status as of April 30:
-
Site Specific Hardware/Software Installation Status:
-
Multi node equipment distributed and relocated:
-
to the cart (specifically the computer hardware).
-
to room 315 (cameras).
-
AccessGrid Events:
-
Apr 01: Joined the regularly scheduled WG AccessGrid technical meeting:
-
summary notes are not currently available
-
Apr 08: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Apr 15: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Apr 22: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Apr 28: Local PIG (Personal Interface to the AccessGrid) Node was used
for the: BCNet WestGrid demo sessions.
-
Apr 29: no regular WG AccessGrid technical meeting for the 29th.
-
Documentation/Web:
March, 2004:
-
Site Specific Hardware/Software Installation Status:
-
Multi node equipment remained in the temporary location (i.e., Room 323
in GSB) throughout the month.
-
Used the Multi node equipment to test (evaluate and debug) new
software, VP.exe ; detail are in the Mar 18 tec meeting notes.
-
Upgraded our 3 local PIG nodes: New, inexpensive, desktop mics (with
echo cancellation) arrived; and were configured and installed.
-
Room Renovation Status:
-
Photo, as of March 18th, available:
http://www.ualberta.ca/AICT/RESEARCH/AG/
Photos/wp04Mar18.315rm.480x360.jpg
-
March 31 Status:
-
Selective demolition; completed.
-
Removal of asbestos tiles; completed.
-
Core-ing; completed.
-
Electrical rough-in; completed.
-
Drywall; completed.
-
T-bar Ceiling installation; ongoing.
-
Lighting installation; ongoing.
-
Mechanical: installation of air conditioning; ongoing.
-
Cart construction; completed on March 23, 2004.
-
AccessGrid Events:
-
Mar 04: Joined the regularly scheduled WG AccessGrid technical meeting:
-
summary notes are not currently available.
-
Mar 11: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Mar 18: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Mar 24: Local Multi Node AccessGrid Equipment was used for the:
WestGrid Purchasing and Financial meeting.
-
Mar 25: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Documentation/Web:
-
Started a publicly available "under construction" local
AccessGrid web site:
http://www.ualberta.ca/AICT/RESEARCH/AG/index.html
-
Continue to archive various reports, documents and updates, in web
accessible directories, but most of the information is not linked to,
yet.
February, 2004:
-
Site Specific Hardware/Software Installation Status:
-
Multi node equipment remained in the temporary location (i.e., Room 323
in GSB) throughout the month.
-
Setup for the use of the AG equipment in the AMMI lab (located on the
3rd floor of the Computing Science Building); ongoing.
-
Intermittent Multicast issues; continue.
-
Installed a WestGrid Backup VenueServer on local machine
( https://venues.AICT.ualberta.ca:8000/Venues/default ).
-
Room Renovation Status:
-
AccessGrid Events:
-
Feb 05: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Feb 9 - 10: WestGrid Vancouver Meeting:
-
The AccessGrid was used so that local UofA people, (i.e., those who
could not attend the meeting in person) were still able to participate
and observe.
-
Also note that the presenter was not available onsite (because of
scheduling misunderstandings), but was still available to join the
meeting via the AccessGrid from Utah.
-
Feb 12: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Summary notes are not currently available.
-
Feb 19: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Feb 26: Joined the regularly scheduled WG AccessGrid technical meeting:
-
Documentation/Web:
January, 2004:
-
Site Specific Hardware/Software Installation Status:
-
Multi node equipment moved to new temporary location Room 323 in GSB.
-
Setup for the use of the AG equipment in the AMMI lab (located on the
3rd floor of the Computing Science Building) started:
-
Multicast beacon on grew-lake (a CompSci machine); started.
-
CompScience main backbone router was multicast enabled.
-
Personal Interface to the AccessGrid (PIG) node installed on a CompSci
office machine.
-
Multicast issues from both the CompSci and the GeneralServices
buildings continue through most of the month.
-
Room Renovation Status:
-
Lighting and electrical diagrams; in progress.
-
Scheduled start date for construction remains for mid February.
-
Cart construction; in progress.
-
AccessGrid Events:
-
January 8: Missed the regularly scheduled WG AccessGrid meeting;
-
January 12: Collab Vis Steering committee meeting; using accessgrid
nodes for meeting;
-
January 15: Joined Regularly scheduled WG AccessGrid meeting;
-
January 22: Joined Regularly scheduled WG AccessGrid meeting;
-
January 29: Joined Regularly scheduled WG AccessGrid meeting;
-
January 29: Successfully tested the display machine with SFU's
vizserver.
December, 2003:
-
Equipment Hardware/Software Installation Status:
-
XAP Echo canceler installed. Computer hardware/software/network AG node
fully operational from temporary office location.
-
December 22: Prepare the equipment for a move to new temporary
location.
-
Room Renovation Status:
-
December 01: Confirmation from Facility Management for design of GSB
315.
-
December 17: Confirmation from Sr. Architectural Technologist, Capital
Programs, for scope of the renovation project.
-
AccessGrid Events:
-
December 4: Joined Regularly scheduled WG AccessGrid meeting,
-
December 11: Joined Regularly scheduled WG AccessGrid meeting,
-
December 18: Joined Regularly scheduled WG AccessGrid meeting,
November, 2003:
-
Equipment Hardware/Software Installation Status:
-
Early Nov: DNS issues on local main node; reported the problem to the
main AG-Tech mailing list.
-
Nov 13: Local host file problem solved. Triumf beacon now showing that
the UofA node is both sending and receiving.
-
Nov 14: Multi machine node up and running.
-
Nov 25: Moved all the equipment to emulate the cart configuration.
Also, started to set up the Gentner, and related audio equipment, to
work with the sound machine node.
-
Here is a photo of the setup as of November 27th:
http://www.ualberta.ca/AICT/RESEARCH/AG/
Photos/wp03Nov27.agmeet2.640x480.jpg
-
Room Renovation Status:
-
Meetings with UofA Project Planning Office (PPO) November 24:
-
PPO will arrange for the design to move to the Capital Programs and the
Project Management Office PMO; the PMO arrange for the drawings and
specifications to go to tender.
-
AG team will prioritized their list of infrastructure upgrades.
-
Nov 27: Finalizing the design of the Cart; ongoing.
-
Nov 27: Room Renovation are now with the Project Management Office
(PMO).
-
AccessGrid Events:
-
November 6: Joined Regularly scheduled WestGrid AccessGrid 'dropin'
meeting:
-
November 13: Joined Regularly scheduled WestGrid AccessGrid 'dropin'
meeting.
-
November 20: Joined Regularly scheduled WestGrid AccessGrid 'dropin'
meeting.
-
November 27: Joined Regularly scheduled WestGrid AccessGrid 'dropin'
meeting.
-
November 18-20: Observed the SC Global at SC2003 in Phoenix. SC Global
was a demonstration of the Access Grid at the SC2003 conference. SC
Global had a number of discussions, meetings and showcase events; as
well as speakers from remote locations. The link to the Phoenix
Convention Center was with Access Grid nodes worldwide.
-
Other related events:
-
NewMIC unavailable as of Nov 20th.
October, 2003:
-
Hardware/Software and Operational Events:
-
Multicast operational in early October.
-
Video color issues resolved mid October.
-
Room Renovation Status:
-
Oct 6: Meeting with Capital and Strategic Planning Services. They will
recommend to the Capital Programs Project Management Office (PMO) to
continue with Alastair Cockburn for the preliminary cost estimate. They
will ask for a preliminary time-line, if possible.
-
AccessGrid Events:
-
October 2: Joined Regularly scheduled WestGrid AccessGrid 'dropin'
meeting - connected via AG2.1.1 pig node.
-
October 9: Joined Regularly scheduled WestGrid AccessGrid 'dropin'
meeting - connected via AG2.1.1 pig node.
-
October 16: We were unable to join meeting.
-
October 23: We were unable to join meeting.
-
October 30: Joined Regularly scheduled WestGrid AccessGrid 'dropin'
meeting:
-
Other related event:
-
Vigo working as expected and successfully connected to NewMIC via H.323
September, 2003:
-
Equipment Hardware/Software Installation Status:
-
Multicast issues continue through the month; connections via unicast
are stable.
-
Video quality issues continue through most of September; and the
problem may stem from a technical issue between window manager and the
accessgrid software.
-
Sept 23: The switch from WindowsXP to RedHat for the video machine,
completed.
-
Networking for the AccessGrid: Fiber installed from the machine room to
room 315.
-
Room Renovation Status:
-
September 9: Attended meeting regarding 315 renovations schedule (for
AccessGrid project).
-
September 26 Group meeting with new members:
-
Finalized the "cart" concept with the motivation being that
the access node equipment can be moved:
-
to GSB 315, as needed.
-
to various offices for maintenance as needed.
-
to the AMMI lab, as needed.
-
Looked over the copies of the room upgrade project description from
Alastair Cockburn Architect Ltd. It was decided to "sign-off"
on the preliminary construction plans so that we can get preliminary
cost estimates.
-
Overview of room diagram discussed with new members:
http://www.ualberta.ca/AICT/RESEARCH/AG/Floor_5_24ftscreen.jpg
-
AccessGrid Event:
-
September 11: The first time we joined regularly scheduled WestGrid
AccessGrid testing meeting:
-
September 18: We were unable to join meeting.
-
September 25: Unable to join meeting:
Contacting Us
Please feel free to contact us at:
access.grid@ualberta.ca
|
|