NSERC Industrial Research Chair in the Industrialization of Building Construction

Technical Reports

  1. Olearczyk, J., Kosa, J., Buettner, B., and Al-Hussein, M. (2017). Engineering Multi-Hole Spreader Beam (EMSB-1). Technical report submitted to NCSG Crane & Heavy Haul Services. March, 2017.
  2. Olearczyk, J., Kainat, M., Adeeb, S., Al-Hussein, M., and Bouferguene, A. (2015). Mullen Crane & Transport Spreader Bar Analysis: Phase I Final Report. Technical report submitted to NCSG Crane & Heavy Haul Services. February, 2015.
  3. Abudan, A., Fan, G., Sukkarieh, M., and Li, X. (2014). Physical Demand Analysis Project Summary Report. Technical report submitted to All Weather Windows. August, 2014. 59 pages.
  4. Gül, M., Sharmin, T., Li, X., Nikolaidis, I., and Al-Hussein, M. (2013). Integrated Construction and Energy Management System for Affordable Housing in Fort McMurray. Progress report submitted to Integrated Management & Realty Ltd. (IMR) and Cormode & Dickson. 58 pages.
  5. Al-Hussein, M., Cheng, J.J.R., Ackerman, M., Gül, M., Yu, H., Zaman, H., Singh, G., Mutsuddy, R., and Alrifai, A. (2012). Evaluation of Energy Efficient Wall Systems for Mid-rise Wood Frame Buildings. Final Report to Natural Resources Canada (Value to Wood Program). 59 pages.
  6. Sharmin, T., Li, X., Al-Hussein, M., Gül, M., and Gökçe, U. (2012). Stony Mountain Plaza: Integrated Construction and Energy Management System for Affordable Housing in Fort McMurray, Alberta. 52 pages.
  7. Al-Hussein, M., Manrique, J., and Mah, D. (2009). North Ridge CO2 Analysis Report—Comparison Between Modular and Onsite Construction. Report submitted in conjunction with Integrated Management & Realty Ltd. (IMR). 21 pages.
  8. Yu, H., Al-Hussein, M., and Tweed, T. (2009). Redesign Production Process in Housing Using Lean Principles and Value Stream Mapping. Report for Canada Mortgage and Housing Corporation (CMHC). 58 pages.
  9. Olearczyk, J., Al-Hussein, M., Bouferguene, A., and Telyas, A. (2007). Crane Layout Optimization for Five New Student Residence Buildings at Muhlenberg, MacGregor Village in Allentown, Pennsylvania. Final Report for Kullman Building Corporation, Lebanon, New Jersey.
  10. 2005. Report to the City of Edmonton Drainage Services Department on the findings and recommendations made for Drainage Services crew efficiency. 250 pages.
  11. 2005. Report to the City of Edmonton Drainage Services Department on the findings and recommendations made for the use of trenchless technology and the enhancement of as built drawings and information. 110 pages.
  12. 2005. Report to the City of Edmonton Land Development Department on the findings and recommendations made for complaint handling and lot-grading process improvement. 130 pages.
  13. Agbulos, A. C., Al-Hussein, M., and AbouRizk, S. (2002). Physical Demands Analysis of Drainage Operations Crews. Report for the City of Edmonton Asset Management and Public Works: Drainage Services Department.
  14. Agbulos, A. C., Al-Hussein, M., and AbouRizk, S. (2002). Work Analysis Study of the City of Edmonton Drainage Operations Maintenance Activities. Report for the City of Edmonton Asset Management and Public Works: Drainage Services Department. (This report includes the productivity standards which the City of Edmonton Drainage Section has implemented on their maintenance crews.)
  15. Al-Hussein, M. (1998). D-Crane. User Manual for Concordia University and GUAY Cranes.
  16. Al-Hussein, M. (1998). Crane Advisor. User Manual for Concordia University and GUAY Cranes.