Building Maintenance
We work to maintain campus environments that support exceptional student experiences, nurture research innovation and ensure our people can flourish and succeed.
When addressing building maintenance, we balance emergency and high-risk issues with those that impact teaching, research, the student experience or administrative success in order to keep our campuses safe, accessible and welcoming for the entire community.
How we prioritize maintenance issues
We consider the impact an issue has on our people when responding to maintenance issues to ensure safe, consistent and reliable building operations.
Of highest concern are issues that present a crucial obstacle, next are issues that present an impediment and lastly are issues that present an inconvenience. An obstacle is a maintenance issue that stops us from what we are trying to achieve while an impediment is an issue that slows us down, but does not stop us.
Please note that scheduled regulatory compliance inspections, preventative maintenance and predictive maintenance are prioritized separately.
Priority 1: Emergency Maintenance
Target timeline: Immediate action
This includes issues with base building systems that are an immediate operational threat due to equipment failure or an unacceptably compromised condition such that they are a crucial obstacle to success.
Priority 2: Reactive Maintenance
Target timeline: Today or tomorrow
This includes issues with base building systems that pose an impending operational threat due to equipment failure or an unacceptably compromised condition such that if they are not addressed they could become a Priority 1. These present a crucial obstacle to success.
Priority 3: Corrective Maintenance (Non-deferrable)
Target timeline: Daily maintenance as budget spending allows, after higher priorities are completed
This includes issues with base building systems that pose a potential operational threat due to noticeably aging equipment or deteriorating conditions such that if they are not addressed they could become a Priority 2. These present an impediment to success.
Priority 4: Corrective Maintenance (Deferrable)
Target timeline: Remains deferred until it evolves into a higher priority
This includes issues with base building systems that pose a future operational threat due to less than ideal operating conditions such that if they are not addressed they could become a Priority 3. These present opportunities for operational improvement.